Projects

Projects

Recent Work

EXPLORE OUR PROJECT CAPABILITIES

Supporting Projects from Procurement to Commissioning

GULFTECH provides comprehensive technical, engineering, procurement and project support to EPC contractors, end users and project partners across the UAE and the wider Middle East. Our capabilities extend from product selection and engineering through manufacturing, inspection, logistics, installation, commissioning and after-sales support.
01

EPC Procurement Support

Procurement and technical support for major EPC contractors, covering bidding, firm projects, product sourcing and project requirements.
02

Project Product Engineering

Design, redesign, modification and technical support for products supplied to UAE and Middle East projects.
03

End-to-End Product Solutions

Complete project support from product selection and engineering through manufacturing, inspection, delivery and site support.

04

Design, Testing & Documentation

Design, testing, TPI, expediting, logistics, repairs, refurbishment and complete project documentation support.
05

Product Introduction & Presentations

Technical product introductions, presentations and application support for clients, EPC contractors and end users.
06

Production, Installation & Commissioning

Manufacturing supervision, engineering, installation supervision, commissioning and site technical support.
07

Pre-Commissioning & Pipeline Services

Pre-Commissioning & Pipeline Services
08

Sales & After-Sales Support

Technical assistance, spare parts, maintenance coordination, troubleshooting and long-term product support.

09

Warranty & Refurbishment

Warranty coordination, inspection, repair, refurbishment, testing and replacement support for supplied products.

Project Showcase

Featured Oil & Gas Projects

A closer look at major EPC, onshore, offshore and gas processing projects across the UAE where GULFTECH has supported leading operators and contractors with products, engineering and technical services.

borouge 4 project - GULFTECH
Borouge (ADNOC & Borealis)

EPC for Borouge 4 Project

Borouge 4 is one of the largest industrial projects underway in the UAE. Built by Borouge on behalf of the project’s owners, ADNOC and Borealis, it will boost production capacity by 1.4 million tonnes and make it the world’s largest single-site polyolefin complex. Once complete, it will enhance Borouge’s ability to meet growing global demand for innovative polyolefin solutions across energy, infrastructure and advanced packaging, while driving economic diversification, creating employment and supporting the growth of the UAE’s industrial base.

meram project - GULFTECH
ADNOC Gas

EPC for Maximize Ethane Recovery & Monetization (MERAM)

The MERAM project adds new facilities to recover ethane from residue gas at existing NGL Recovery Units, including Asab-0/3, Bab, Habshan 1 Trains 1, 2 & 3, Habshan 2, Habshan 5 (Lean Trains) and BuHasa. It also includes modifications to existing facilities to accommodate the HMP 4.0 production profile and new feed gas and product (NGL, sales gas) pipelines, meeting Borouge 4 demand of 2.0 MMTPA of sustainable raw ethane supply. Facilities are located mainly at the Habshan 5 gas processing plant, with pipelines between Habshan and Ruwais and interconnections to the sales gas network.

hail ghasha project - GULFTECH
ADNOC

Hail & Ghasha Development Project – Onshore Facilities

The Hail and Ghasha development design combines innovative decarbonization technologies into one integrated solution. The project will capture 1.5 million tonnes per year (mtpa) of CO2, while low-carbon hydrogen is produced that can replace fuel gas and further reduce emissions. The project will also leverage clean power from nuclear and renewable sources from the grid.

sqm tie in project - GULFTECH
ADNOC Onshore

Call-Out Services Agreement for Tie-In at Shah, Qusahwira & Mender

The project “EPC for Tie-in Works at SQM (Package-4)” was initiated to sustain and enhance oil production from the Shah, Qusahwira and Mender (SQM) fields, located approximately 200, 220 and 240 km south of Abu Dhabi city respectively. These fields are managed and operated by ADNOC Onshore.

bab asab rehab project - GULFTECH
ADNOC Onshore

Rehabilitation & Integrity Reinstatement of Flowlines and Trunk Lines in Bab & Asab (107105)

This ADNOC Onshore project (Project ID 107105) focuses on repairing and improving the integrity of pipelines in the Bab and Asab oil fields. Key activities include replacing damaged flowlines, rerouting existing lines to reduce field congestion, and modifying supports to address issues such as buckling and dislocation. The project is part of a larger upgrade to minimize life-cycle costs and enhance the efficiency of the fields.

bifp project - GULFTECH
ADNOC Onshore

EPC for Bab Integrated Facilities Project (BIFP)

The Bab Integrated Facilities Project (BIFP) is an ADNOC Onshore project to upgrade and expand the Bab oil and gas field in Abu Dhabi, sustaining and enhancing its crude oil production capacity to at least 450,000–485,000 barrels per day. It involves constructing new processing facilities, upgrading existing ones, and implementing new technologies such as digital oil fields and cluster drilling to increase production and efficiency from the mature field.

bab onshore project - GULFTECH
ADNOC Onshore

Bab Onshore Field Upgrade

The Bab oil field, also known as the Murban Bab oil field, is the biggest onshore oil field in Abu Dhabi at 1,200 km² and the oldest in the UAE, operating since the early 1960s. As part of ADNOC’s 2030 smart growth strategy, the field is being upgraded to sustain crude output of 485,000 barrels of oil per day from 2023 onwards. The EPC scope includes greenfield works with demanding logistics and brownfield works with their associated challenges. Surface facilities comprise 118 new oil-producing, water injection and artificial lift wells, 462 km of flowlines/trunk lines and 150 km of fiber optic cables, plus well-bays, pressure let-down stations, water injector clusters and associated infrastructure. Plant modifications include 80 km of piping, fire & gas detection and firewater systems.

buhasa project - GULFTECH
ADNOC Gas Processing

Buhasa De-Bottlenecking & Associated Piping

The Buhasa De-Bottlenecking & Associated Piping Project for ADNOC Gas Processing aims to enhance the capacity and efficiency of the existing gas processing facilities at Bu Hasa. It involves modification and rerouting of process and utility pipelines, installation of new valves and tie-ins, upgrading instrumentation, and replacing critical equipment to eliminate operational bottlenecks — improving flow distribution, increasing throughput, and ensuring safe, reliable and optimized plant operations in line with ADNOC standards.

lower zakum project - GULFTECH
ADNOC Offshore

Lower Zakum Long Term Development Phase-1 (LZ-LTDP-1) New Main Gas Line (NMGL)

The LZ-LTDP-1 New Main Gas Line project is an ADNOC Offshore initiative focused on installing a new main gas pipeline to support the field’s long-term production and gas export capacity. It encompasses the engineering, procurement, construction and commissioning of the NMGL system, ensuring safe, efficient and reliable gas transportation from Lower Zakum facilities to onshore processing infrastructure, enhancing operational performance and supporting ADNOC’s strategic energy objectives.

zirku fire project - GULFTECH
ADNOC Offshore

EPC for RSF & FSF Fighting System Upgrade for COS Tanks at Zirku

This EPC project upgraded the Rim Seal Fire (RSF) and Full Surface Fire (FSF) fighting systems for the Crude Oil Storage (COS) tanks at Zirku Island to enhance fire safety and asset integrity. The scope included demolition of existing risers and bund fire protection piping, installation of new risers, pipe supports, foam skids and comprehensive FSF protection for tanks 1–6. A Corrosion Risk Assessment (CRA) ensured long-term integrity, and the systems provide early detection and suppression of fires in the rim seal zone and across the tank surface using foam or gas-based agents.

belbazem project - GULFTECH
ADNOC Offshore

Belbazem Offshore Field Development

The Belbazem offshore project is an ADNOC initiative for full field development, awarded as an EPC contract in 2021. It includes constructing offshore wellhead towers, pipelines, and facilities for water injection and gas compression to produce crude oil and gas, utilizing synergies with existing facilities for cost and environmental benefits.

al dabbiya project - GULFTECH
ADNOC Onshore

Al Dabb’iya Surface Facilities (Phase III)

Phase III of the Al Dabb’iya project is part of ADNOC Onshore’s Northeast Bab (NEB) development program, located in a shallow coastal and marine area 40 km southwest of Abu Dhabi — an environmentally sensitive area with mangroves, coral reef, salt marshes and protected wildlife. The program adds 73,000 barrels of oil per day through gathering & injection systems, oil export and gas import/export pipelines. Works comprised gathering crude oil from onshore and offshore well clusters and transporting it through 100 km of offshore carbon steel pipelines to the central process plant, along with modular steel structures, 450,000 dia-inches of piping, 56 km of offshore cabling and dredging of pipeline corridors.

asab sahil pkg3 project - GULFTECH
ADNOC Onshore

Call-Out Services Agreement for Tie-In at Asab & Sahil (Package-3)

A call-out agreement under which a range of tie-in services are performed as needed at the Asab and Sahil fields. This includes engineering, procurement and construction (EPC) of new facilities, flowlines and connections to support oil production, designed to enhance the oil production capacity of the fields.

asab sahil pkg1 project - GULFTECH
ADNOC Onshore

Flowlines & Wellhead Installations at Asab and Sahil (Package-1, Part-1)

The project involves the procurement, fabrication and construction of flowlines and wellhead installations for Package-1, Part-1 at the Asab and Sahil fields. It encompasses detailed engineering, supply of materials and equipment, installation of wellhead structures, associated flowlines and tie-ins to existing infrastructure in compliance with ADNOC standards — including testing, commissioning and handover of fully operational systems to support enhanced hydrocarbon production.

tpo misc project - GULFTECH
ADNOC Onshore

EPC for Miscellaneous Works at TPO and Gas Fields

The scope covers engineering, procurement and construction of two power skids at Jebel Dhana, including modification of various switchgears, additional isolation valves on inlet and outlet connections to small and medium tanks, and an RGA lightning system for tanks. It also covers implementation of Environmental Impact Assessment (EIA) study recommendations for ADCOP line block valve stations, IPS and MOT.

haliba project - GULFTECH
Al Dhafra Petroleum

Construction Works for Haliba Wells Tie-Ins – Main Body & Near Haliba Prospects

Al Dhafra Petroleum Operations Company is developing its concession Area A1, which includes the Haliba Main Body, Haliba North & South, Near Haliba Prospects (Al Humrah, Bu Tasa) and the East Area fields. The EPC works cover tie-ins of different well types, including oil producer wells, ESP artificial-lift oil producer wells, water injection, water supply and water disposal wells.

Our Experience

Our Project Track Record

A selection of projects successfully delivered for leading organizations across the UAE.

SL. NO. CLIENT / CONSULTANT PROJECT YEAR
1 ADNOC ONSHORE 4300 B4 U & O BOROUGE PROJECT 2026
2 ADNOC GAS MAXIMIZE ETHANE RECOVERY & MONETIZATION (MERAM) – EPC 2026
3 ADNOC ONSHORE HAIL AND GHASHA DEVELOPMENT PROJECT PACKAGE 2 – ONSHORE FACILITIES 2026
4 ADNOC ONSHORE CALL-OUT SERVICES AGREEMENT FOR TIE-IN AT SHAH/QUSAHWIRA/MENDER (PART 2) 2026
5 ADNOC ONSHORE REHABILITATION AND INTEGRITY REINSTATEMENT OF FLOW LINES AND TRUNK LINES IN BAB & ASAB PROJECT 2026
6 ADNOC GAS FEEDSTOCK, UTILITIES AND INTERCONNECTING PIPELINES FOR TA’ZIZ INDUSTRIAL PARK 2026
7 ABU DHABI POLYMERS CO.LTD. (BOROUGE) ABU DHABI POLYMER RUWAIS PLANT PROJECT 2026
8 ADNOC ONSHORE EPC FOR NEB FACILITIES UPGRADE PROJECT 2026
9 ADNOC GAS EPCM FOR LONG TERM FACILITIES – ASAB & BUHASA 2026
10 ADNOC ONSHORE EPC FOR REHABILITATION AND INTEGRITY REINSTATEMENT OF FLOW LINES AND TRUNK LINES IN BAB & ASAB PROJECT 2026
11 ADNOC ONSHORE ADNOC ONSHORE NEB FACILITIES UPGRADE PROJECT 2026
12 VOPAK HORIZON VOPAK PROJECT 2026
13 ADNOC ONSHORE CALL-OUT SERVICES AGREEMENT FOR TIE-IN AT SHAH-QUSAHWIRA MENDER (PART 4) 2026
14 CONSOLIDATED EDISON COMPANY OF NEW YORK (CONED) ASTORIA LNG PROJECT USA 2026
15 ADNOC OFFSHORE PROCUREMENT & CONSTRUCTION OF FACILITIES FOR MUBARRAZ REDEVELOPMENT PROJECT 2026
16 ADNOC DRILLING ADNOC DRILLING PROJECT 2026
17 ADNOC ONSHORE NITROGEN CYLINDER SKID PACKAGE FOR EPC FOR NEB FACILITIES UPGRADE PROJECT (P174) 2026
18 ADNOC GAS O&M LLC ADNOC GAS PROJECT 2026
19 ADNOC OFFSHORE LOWER ZAKUM PROJECT 2026
20 ABU DHABI POLYMERS ADNOC PROJECT 2026
21 ADNOC ONSHORE GAS DIVERSION PROJECT (VARIATION ORDER) – FAST-TRACK PROJECT 2026
22 ADNOC OFFSHORE LOWER ZAKUM LONG TERM DEVELOPMENT PHASE – I (LZ-LTDP-1) NEW MAIN GAS LINE PROJECT 2026
23 ADNOC ONSHORE CHEMICAL INJECTION SKID FOR EPC FOR AL DABBIYA THAMAMA B TRANSITION ZONE DEVELOPMENTS- PHASE II PROJECT 2026
24 ADNOC GAS HABSHAN 1 TO CS3 – AG TIE IN – ADNOC 2026
25 ADNOC GAS EPCM CONTRACT FOR THE HABSHAN DBN PROJECT 2026
26 ADVARIO ADVARIO OMAN PROJECT 2026
27 ADNOC ONSHORE EPC FOR NEB MISCELLANEOUS MODIFICATION AND ENHANCEMENT PROJECT 2026
28 NEOM COMPANY NEOM GREEN HYDROGEN PROJECT (G2HO) 2026
29 ADNOC ONSHORE ADNOC ONSHORE – EPC CALL-OUT OF BAB ARTIFICIAL LIFT PHASE-II PROJECT 2026
30 ADNOC ONSHORE CALL OUT SERVICES AGREEMENT FOR TIE IN AT SHAH/QUSAHWIRA MENDER (PACKAGE 4) 2026
31 ADNOC ONSHORE WEST EAST PIPE LINE (WEP) PROJECT 2026
32 FUJAIRAH OIL TANKER TERMINALS (FOTT) FOTT UPGRADATION WORKS 2026
33 ADNOC GAS PROJECT P5.0 – EPCM FOR HABSHAN DBN 2026
34 ADNOC ONSHORE ADNOC ONSHORE – CALL OUT SERVICES AGREEMENT FOR TIE IN AT SHAH/QUSAHWIRA MENDER (PART 2) -PROJECT NO.P30380 2026
35 ADNOC GAS HABSHAN 0 BOILERS UPGRADE PROJECT – PROJECT NO:50021 2026
36 ADNOC ONSHORE REHABILITATION AND INTEGRITY REINSTATEMENT OF FLOW LINES AND TRUNK LINES IN BAB & ASAB PROJECT 2025
37 ADNOC ONSHORE KENT BAB PROJECT 2025
38 AL DHAFRA PETROLEUM AL DHAFRA PETROLEUM PROJECT 2025
39 ADNOC ONSHORE BAB INTEGRATED FACILITIES PROJECT 2025
40 ADNOC ONSHORE PROVISION OF PLANT SHUTDOWN ACTIVITIES AT NEB & SE FIELDS 2025
41 ADNOC ONSHORE CALL-OUT SERVICES AGREEMENT FOR TIE-IN AT SHAH/QUSAHWIRA/MENDER PACKAGE 4 – BATCH 2 WELLS 2025
42 ADNOC GAS ESTIDAMA SALES GAS PIPELINE NETWORKS – PACKAGE 4 & 7 2025
43 ADNOC ONSHORE CALL-OUT SERVICES AGREEMENT FOR TIE-IN AT SHAH/QUSAHWIRA/MENDER PACKAGE 4 – BATCH 1 WELLS 2025
44 ADNOC ONSHORE EPC OF SAHIL PHASE III DEVELOPMENT PROJECT 2025
45 EMIRATES STEEL EMIRATES STEEL PROJECT 2025
46 BOROUGE BOROUGE PROJECT 2025
47 ADNOC GAS MAXIMIZE ETHANE RECOVERY & MONETIZATION (MERAM) – EPC 2025
48 ADNOC ONSHORE CALL-OUT SERVICES AGREEMENT FOR TIE-IN AT ASAB-SAHIL (PART 2) – PKG 3 2025
49 ADVARIO TERMINALS LLC C1 PROJECT 2025
50 VOPAK VHFL PROJECT 2025
51 AL DHAFRA PETROLEUM AL DHAFRA PETROLEUM PROJECT – CONSTRUCTION WORKS FOR HALIBA WELL TIE INS FOR MAIN BODY & NEAR HALIBA PROSPECTS 2025
52 ADNOC ONSHORE CALL-OUT SERVICES AGREEMENT FOR TIE-IN AT SHAH, QUSAHWIRA & MENDER (PKG-4) 2025
53 ADNOC ONSHORE CALL-OUT SERVICES AGREEMENT FOR TIE-IN AT SHAH/QUSAHWIRA/MENDER (PART 2) 2025
54 FUJAIRAH OIL TANKER TERMINALS (FOTT) CONNECTION TO FOTT MM1 BUNKER JETTIES 2025
55 ADNOC GAS MIRFA PLANT MODIFICATION AND PIPELINE PROJECT 2025
56 AL DHAFRA PETROLEUM TIE-INS OF WELLS IN HALIBA AND OTHER FIELDS (EPC WORKS) 2025
57 FUJAIRAH OIL TANKER TERMINALS (FOTT) VHFL- CONNECTION TO FOTT MM1 BUNKER JETTIES 2025
58 ADNOC ONSHORE J217 – EPC CALL-OUT OF BAB ARTIFICIAL LIFT PHASE-II PROJECT (P168 / P11671) 2025
59 ADNOC ONSHORE EPC FOR MODIFICATION WORKS AT TPO AND GAS FIELDS 2025
60 ADNOC REFINING J736 – UPGRADE RAW ETHANE EXPORT TO ADNOC REFINING & HEPTANE BLENDING FLOW METERS AT RUWAIS NGL, ABU DHABI PROJECT 2025
61 MODON GHANTOOT DEVELOPMENT PROJECT – SITE CLEARANCE WORKS BY MODON 2025
62 AZULE ENERGY AGOGO FPSO PROJECT 2025
63 ADNOC REFINING HYDROCRACKER REVAMP PROJECT 2025
64 ADNOC ONSHORE EPCM FOR UPGRADE OF ADCOP FACILITIES TO CATER 2.0 MMBOPD PROJECT 2025
65 ADNOC ONSHORE 1828- EPCM FOR BAB FAR NORTH FULL FIELD DEVELOPMENT PROJECT (BFN) 2025
66 ADNOC ONSHORE CALL-OUT SERVICES AGREEMENT FOR TIE-IN AT SHAH, QUSAHWIRA & MENDER (PART 1) 2025
67 ADNOC GAS HABSHAN & BAB CONTROL SYSTEMS UPGRADE PROJECT (PACKAGE 1) 2025
68 ADNOC ONSHORE PROJECT-REHABILITATION AND INTEGRITY REINSTATEMENT OF FLOW LINES AND TRUNK LINES IN BAB & ASAB PROJECT 2025
69 ADNOC GAS ESTIDAMA SALES GAS PIPELINE NETWORKS – EWEC PHASE -1 2025
70 VTTI FUJAIRAH VTTI PROJECT 2025
71 ADNOC OFFSHORE HAIL & GASHA PROJECT 2025
72 ADNOC ONSHORE CALL – OUT SERVICES AGREEMENT FOR TIE-IN AT SHAH/QUSAHWIRA/MENDER PACKAGE 4 2025
73 ADNOC ONSHORE EPC FOR BAB FACILITIES UPGRADE PROJECT 2025
74 BROOGE PETROLEUM AND GAS INVESTMENT COMPANY (BPGIC) BPGIC PROJECT 2025
75 ADNOC GAS MAXIMIZE ETHANE RECOVERY & MONETIZATION (MERAM) 2025
76 ADNOC ONSHORE EPC CALL-OUT OF BAB ARTIFICIAL LIFT PHASE-II PROJECT 2025
77 ADNOC OFFSHORE HAIL & GASHA PROJECT PACKAGE 2 2025
78 ADNOC GAS MERAM PROJECT 2025
79 INTERNATIONAL MARITIME ORGANIZATION IMO 2020 PROJECT 2025
80 ADNOC ONSHORE EPC FOR NEB FACILITIES UPGRADE PROJECT 2025
81 ADNOC OFFSHORE MUBARRAZ REDEVELOPMENT PROJECT 2025
82 ADNOC ONSHORE CALL-OUT SERVICES AGREEMENT FOR TIE-IN AT SHAH/QUSAHWIRA/MENDER PART 4 2025
83 ADNOC OFFSHORE ADNOC OFFSHORE PROJECT 2024
84 ADNOC ONSHORE CONSTRUCTION OF FLOWLINES & WELLHEAD TIE IN INSTALLATIONS IN BAB & NEB FIELD (PACKAGE 6) -FOR ON PAD WELLS _ P7099 2024
85 ADNOC ONSHORE EPC FOR ADCOP REMAINING WORKS AT MOT, MPS, AND IPS – (PACKAGE 1 & 2) 2024
86 ADNOC GAS PROCESSING ADNOC GAS PROJECT 2024
87 GALFAR ENGINEERING GALFAR ENGINEERING PROJECT 2024
88 SK ENGINEERING AND CONSTRUCTION EPC FOR M PROJECT – SEEPAGE WATER TREATMENT PACKAGE 2024
89 PETRONAS SABAH FLNG PROJECT 2024
90 ADNOC L&S ADNOC L&S PROJECT 2024
91 ADNOC GAS HABSHAN & BAB CONTROL SYSTEM UPGRADE 2024
92 ARABIAN INDUSTRIES ARABIAN INDUSTRIES PROJECT 2024
93 ADNOC ONSHORE EPC FOR MODIFICATION WORKS AT TPO AND GAS FIELDS 2024
94 ADNOC ONSHORE EPC FOR NEB MISCELLANEOUS MODIFICATIONS AND ENHANCEMENTS PROJECT 2024
95 ADNOC ONSHORE ADNOC ONSHORE PROJECT 2024
96 ROCKFIN ROCKFIN PROJECT 2024
97 ADNOC GAS MERAM PROJECT 2024
98 ADNOC ONSHORE EPC FOR NEB MISCELLANEOUS MODIFICATIONS (P 12566) /ADNOC ONSHORE/PR FOR QOC 2024
99 ADNOC ONSHORE EPC FOR BAB FACILITIES UPGRADE PROJECT P-151-PIG LAUNCHER & RECEIVERS MAXIMISATION PROJECT 2024
100 ADNOC REFINING PROVISION OF NEW SLURRY PUMP, GAS CON C3 RECOVERY IMPROVEMENT & NEW STEAM REBOILER ALONG WITH ASSOCIATED FACILITIES AT RFCC UNIT RR-I 2024
101 ADNOC ONSHORE SWIC (SIMPLIFIED WATER INJECTION CLUSTERS) FLOWLINES PROJECT 2024
102 ADNOC ONSHORE EPC FOR VO-02,AL NOUF EXPORT GAS MAXIMISATION PROJECT 2024
103 EMIRATES STEEL EMIRATES STEEL PROJECT 2024
104 CONSOLIDATED EDISON COMPANY OF NEW YORK (CONED) ASTORIA LNG 2024
105 ADNOC ONSHORE BIFP PROJECT 2024
106 ADNOC ONSHORE EPCM FOR FUJAIRAH BUSINESS CONTINUITY PROJECT CONSTRUCTION WORK PACKAGE 2024
107 ADNOC OFFSHORE EPC FOR RSF (RIM SEAL FOAM) AND FSF (FULL SURFACE FIRE) FIGHTING SYSTEM UPGRADE FOR COS TANKS AT ZIRKU 2024
108 ADNOC GAS SAMPLING SYSTEM & CBA REACTOR UPGRADE PROJECT 2024
109 ADNOC OFFSHORE SARB ACCELERATED GROWTH PROJECT _PACKAGE 01 2024
110 ADNOC GAS MAXIMIZE ETHANE RECOVERY & MONETIZATION (MERAM) – EPC 2024
111 ECOMAR ECOMAR TERMINAL PHASE 1 PROJECT IN FUJAIRAH 2024
112 ASICO ASICO PROJECT 2024
113 ADNOC ONSHORE 1828- EPCM FOR BAB FAR NORTH FULL FIELD DEVELOPMENT PROJECT (BFN) 2024
114 ADNOC GAS RUWAIS NGL-TRAINS MODIFICATIONS TO SUPPLY BOROUGE-4 FEED STOCK 2024
115 ASTORIA ASTORIA PROJECT 2024
116 ADNOC OFFSHORE EPC WORK OFFSHORE SITE SCHEMES PROJECT – UPPER ZAKUM FIELD 2024
117 ADNOC ONSHORE CALL-OUT SERVICES AGREEMENT FOR TIE-IN AT SHAH/QUSAHWIRA/MENDER PACKAGE 4 – BATCH 1 WELLS 2024
118 NORTH OIL COMPANY, QATAR RUYA PROJECT 2024
119 AL DHAFRA PETROLEUM AL DHAFRA PETROLEUM PROJECT CONSTRUCTION WORKS FOR HALIBA WELL TIE INS FOR MAIN BODY & NEAR HALIBA PROSPECTS 2024
120 ADNOC ONSHORE EPC FOR BAB GAS COMPRESSION PROJECT (BGCP) PHASE III 2024
121 METALFAB EPCM FOR BAB FAR NORTH FULL FIELD DEVELOPMENT PROJECT (BFN) 2024
122 ADNOC ONSHORE PROVISION OF PLANT SHUTDOWN ACTIVITIES AT NEB & SE FIELDS 2024
123 ADNOC OFFSHORE HAIL AND GHASHA DEVELOPMENT PROJECT PACKAGE 2 -ONSHORE FACILITIES 2024
124 ADNOC REFINING TAKREER RUWAIS – 3 MOC’S PROJECT 2024
125 AL DHAFRA PETROLEUM CONSTRUCTION WORKS FOR HALIBA WELLS TIE-INS FOR MAIN BODY & NEAR HALIBA PROJECT 2024
126 ADVARIO ADVARIO PROJECT 2024
127 ADNOC GAS O&M LLC ADNOC GAS PROJECT 2024
128 ADNOC ONSHORE CALL-OUT SERVICES AGREEMENT FOR TIE-IN AT ASAB-SAHIL (PART 2) – PKG 3 2024
129 ADNOC ONSHORE CALL-OUT SERVICES AGREEMENT FOR TIE-IN AT SHAH, QUSAHWIRA & MENDER (PART 1) 2024
130 ADNOC ONSHORE EPC FOR UPGRADATION OF FACILITIES AT SE FIELDS 2024
131 HKN ENERGY ST-B3, SARSANG OILFIELD 2024
132 ADNOC POLYMERS ADNOC PROJECT 2024
133 BOROUGE BOROUGE 4 PROJECT 2024
134 ADNOC ONSHORE EPC OF SAHIL PHASE III DEVELOPMENT PROJECT 2024
135 ADNOC ONSHORE REHABILITATION AND INTEGRITY REINSTATEMENT OF FLOW LINES AND TRUNK LINES IN BAB & ASAB PROJECT 2024
136 ADNOC GAS ESTIDAMA SALES GAS PIPELINE NETWORKS – PACKAGE 4 & 7 2024
137 ADNOC GAS MIRFA PLANT MODIFICATION AND PIPELINE – EPC WORK PROJECT NO-5374 2024
138 ARAMCO FADHILI (GAS INCREMENT PROGRAM PROJECT) 2024
139 ADNOC ONSHORE CONSTRUCTION OF FLOW LINES AND WELL HEAD TIE-INS AT BAB/NEB FIELD 2024
140 ADNOC ONSHORE EPC FOR BAB GAS COMPRESSION PHASE III PROJECT 2023
141 NPCC NPCC PROJECT 2023
142 ADNOC ONSHORE BAB FACILITY UPGRADE PROJECT 2023
143 ADNOC OFFSHORE EPC WORKS OFFSHORE SITE SCHEME PROJECT – UZ FIELDS 2023
144 AZULE ENERGY AGOGO FPSO PROJECT 2023
145 ADNOC ONSHORE BAB GAS COMPRESSION PHASE III 2023
146 VOPAK VOPAK PROJECT 2023
147 ADNOC GAS & ADNOC REFINING RUWAIS POTABLE WATER SYSTEM UPGRADE TRAIN 1 & TRAIN 2 PROJECT 2023
148 FEWA (ETIHADWE) HORIZON-FEWA POWER CONNECTION AT JEFF THE PROJECT 2023
149 AL DHAFRA PETROLEUM AL DHAFRA PETROLEUM PROJECT – CONSTRUCTION WORKS FOR HALIBA WELL TIE INS FOR MAIN BODY & NEAR HALIBA PROSPECTS 2023
150 ADNOC OFFSHORE MUBARAZ ISLAND PROJECT 2023
151 EMIRATES STEEL EMIRATES STEEL PROJECT 2023
152 OIL TANKING TERMINALS & CO OIL TANKING TERMINALS & CO PROJECT 2023
153 ADNOC ONSHORE PROCUREMENT AND CONSTRUCTION OF FLOWLINES AND WELLHEAD INSTALLATIONS AT SQM – SHAH, QUASAWIRA & MENDER (PACKAGE-2, PART-1) 2023
154 ADVARIO ADVARIO PROJECT 2023
155 ADNOC ONSHORE PROCUREMENT AND CONSTRUCTION OF FLOWLINES AND WELLHEAD INSTALLATIONS AT ASAB AND SAHIL (PACKAGE-1, PART-1) 2023
156 JOHN ZINK JOHN ZINK PROJECT 2023
157 BASRA OIL COMPANY (BOC) BOC MAJNOON (P&M) PROJECT, KBR, IRAQ 2023
158 ADNOC REFINING UPGRADE RAW ETHANE EXPORT TO ADNOC REFINING & HEPTANE BLENDING FLOW METERS – RUWAIS NGL 2023
159 ADNOC OFFSHORE EPC WORK OFFSHORE SITE SCHEMES PROJECT 2023
160 ADNOC OFFSHORE UPPER ZAKUM FIELD 2023
161 ADNOC OFFSHORE RFS (RIM SEAL FIRE) AND FSF (FULL SURFACE FIRE) FIGHTING SYSTEM UPGRADE FOR COS TANKS AT ZIRKU 2023
162 ADNOC ONSHORE SWIC FLOWLINES (PKG-1 & PKG-2) PROJECT 2023
163 ADNOC ONSHORE ADNOC ONSHORE PROJECT 2023
164 PROBUS ENGINEERING PROBUS ENGINEERING PROJECT 2023
165 ADNOC GAS & ADNOC ONSHORE BUHASA PLANT FOR UPGRADE PROJECT 2023
166 ADNOC GAS PROCESSING BGCP PROJECT 2023
167 ABU DHABI CRUDE OIL PIPELINE (ADCOP) EPC FOR ADCOP REMAINING WORKS AT MOT, IPS & MPS 2023
168 LINKS MIDDLE EAST LINKS MIDDLE EAST PROJECT 2023
169 ADNOC OFFSHORE LOWER ZAKUM LONG TERM DEVELOPMENT PHASE-1 (LZ-LTDP-1) NEW MAIN GAS LINE (NMGL) PROJECT 2023
170 ADNOC M PROJECT-SKEC 2023
171 ADNOC ONSHORE TECHNICAL SERVICES AGREEMENT (CALL-OFF) FOR BU HASA TIE-INS (P12516) – TASK ORDER 4 (TO4) 2023
172 ADNOC SOUR GAS EPC WORKS FOR INSTALLATION OF ADDITIONAL REFRIGERANT CONDENSERS IN UNITS 0730/0741/0742 2023
173 PORT OF FUJAIRAH FOT PROJECT 2023
174 VOPAK VHFL PROJECT 2023
175 ADNOC ONSHORE EPC FOR BU HASA WATER INJECTION RECOVERY PROJECT 2023
176 PETRONAS SABAH FLNG PROJECT 2023
177 BOROUGE BOROUGE PROJECT 2023
178 ADNOC ONSHORE PROCUREMENT & CONSTRUCTION OF FLOWLINES AND WELLHEAD INSTALLATIONS AT ASAB & SAHIL [PART-2] PACKAGE-1 2023
179 ADNOC ONSHORE EPC FOR MISCELLANEOUS WORKS AT TPO, P150 2023
180 BOROUGE BOROUGE 4 PROJECT 2023
181 PETROCHEM MIDDLE EAST PETROCHEMICAL TERMINAL AT PLOT B052F02 PROJECT 2023
182 ADNOC ONSHORE TANK REFURBISHMENT PROJECT – FOR TANK T1510 2022
183 ABU DHABI PORTS GROUP (AD PORTS / ADPC) / ADNOC ONSHORE DESIGN AND CONSTRUCTION OF KIZAD GAS NETWORK PHASE-2 2022
184 ADNOC ONSHORE BAB INTEGRATED FACILITIES PROJECT (BIFP) 2022
185 ADOC MUBARRAZ OIL FIELD REDEVELOPMENT PROJECT 2022
186 ADNOC OFFSHORE EPC WORK OFFSHORE SITE SCHEMES PROJECT – UPPER ZAKUM FIELD PROJECT 2022
187 ADNOC GAS RUWAIS POTABLE WATER SYSTEM UPGRADE TRAIN 1 & TRAIN 2 2022
188 ADNOC DRILLING ESTIDAMA SALES GAS PIPELINE NETWORK ENHANCEMENT PACKAGE1 2022
189 SARSAN HEAVY ENGINEERING (FZE) NIGERIA PROJECT 2022
190 ADNOC ONSHORE BAB 485 MBD SUSTAINABLE FACILITIES PROJECT 2022
191 PETROCHEM PETROCHEMICAL TERMINAL AT PLOT B052F02 2022
192 PETROBRAS MARIA QUITERIA PROJECT – BRAZIL 2022
193 ENOC ENOC PROJECT 2022
194 ADNOC ONSHORE NITROGEN SKID PACKAGE – DABBIYA THAMAMA TRANSITION ZONE B PROJECT – PHASE II 2022
195 ISSCO MUBARRAZ OIL FIELD REDEVELOPMENT PROJECT 2022
196 ADNOC ONSHORE PROCUREMENT AND CONSTRUCTION OF FLOWLINES AND WELLHEAD INSTALLATIONS AT ASAB AND SAHIL (PACKAGE-1, PART-1) 2022
197 ADNOC ONSHORE PROCUREMENT AND CONSTRUCTION OF FLOWLINES AND WELLHEAD INSTALLATIONS AT SQM – SHAH, QUASAWIRA & MENDER (PACKAGE-2, PART-1) 2022
198 FUJAIRAH OIL TERMINAL (FOT) FOT – VLCC CONNECTIVITY 2022
199 PORT OF FUJAIRAH (POF) POF PROJECT 2022
200 VOPAK HORIZON VOPAK HORIZON FUJAIRAH LIMITED (VHFL) PROJECT 2022
201 ADNOC ONSHORE EPC FOR BAB 485 MBOPD SUSTAINABLE FACILITIES PROJECT 2022
202 ARABIAN CHEMICAL TERMINALS COMPANY LLC (ACTAD) EPC OF GREENFIELD CHEMICAL TERMINAL PROJECT IN KIZAD 2022
203 MIRFA INTERNATIONAL POWER & WATER COMPANY (MIPCO) MIPCO PROJECT 2022
204 AL DHAFRA PETROLEUM CONSTRUCTION WORKS FOR HALIBA WELLS TIE-INS FOR MAIN BODY & NEAR HALIBA PROSPECTS 2022
205 ADNOC OFFSHORE ADNOC OFFSHORE PROJECT 2022
206 AL DHAFRA PETROLEUM AL DHAFRA PETROLEUM PROJECT – CONSTRUCTION WORKS FOR HALIBA WELL TIE INS FOR MAIN BODY & NEAR HALIBA PROSPECTS 2022
207 FUJAIRAH OIL TERMINAL FZC FUJAIRAH OIL TERMINAL FZC PROJECT 2022
208 EMIRATES STEEL EMIRATES STEEL PROJECT 2022
209 BANDUQ COMPANY BANDUQ PROJECT 2022
210 ABU DHABI PORTS GROUP (AD PORTS / ADPC) / ADNOC ONSHORE DESIGN AND CONSTRUCTION OF KIZAD GAS NETWORK – PHASE 2 PROJECT 2022
211 ADNOC ONSHORE ASAB GAS INJECTION TRUNK LINE-2 RELOCATION PROJECT 2022
212 BOROUGE BOROUGE PROJECT 2022
213 ADNOC ONSHORE ADNOC ONSHORE PROJECT 2022
214 VTTI VTTI PROJECT 2022
215 ADCO ADCO TIE INS PROJECT PACKAGE B 2016
216 ABU DHABI JAPAN OIL CO. (ADOC) MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT 2016
217 ADMA OPCO AGFA PROJECT 2016
218 ADCO REFURBISHMENT OF TANK FARM IN JEBEL DHANNA TERMINAL PROJECT 2016
219 ADCO EPC FOR SAHIL FIELD DEVELOPMENT PROJECT PHASE 2 PROJECT 2016
220 ADCO BUHASA PROJECT 2016
221 ADCO FLOW LINES AND WELLHEADS BUHASA PROJECT-BU741 2016
222 ADCO EPC FOR RUMAITHA NORTH CO2 INJECTION PROJECT 2016
223 ADCO EPC FOR BAB FAR NORTH CO2 INJECTION PROJECT 2016
224 ADCO CONSTRUCTION OF MPP, MSMS & MPFMS AT BUHASA RDSS PROJECT 2016
225 ADCO NEW WAG WELLS & CONVERSION OF EXISTING OF GAS INJECTORS WELLS TO WAG WELLS AT SAHIL 2016
226 STAR ENERGY OIL TANKING SEOT PHASE 7A POLYOLS STORAGE AND HANDLING PROJECT 2016
227 PORT OF FUJAIRAH POF FOR THE BERTH 3 EXPANSION WORKS 2016
228 PORT OF FUJAIRAH BPGIC PHASE 1 PROJECT 2016
229 BROOGE PETROLEUM & GAS INVESTMENT COMPANY FZC (BPGIC) BPGIC FUJAIRAH TERMINAL-PHASE 1 2016
230 ECOMAR ENERGY SOLUTIONS PETROLEUM REGENERATION & PROCESSING FACILITY TANK FARM 2016
231 PORT OF FUJAIRAH PORT OF FUJAIRAH PROJECT 2016
232 PORT OF FUJAIRAH POF – VLCC JETTY NO.1 PROJECT 2016
233 ALBANNA ENGINEERING GPC- HAMRIYAH TANK FARM EXPANSION PROJECT 2016
234 ABU DHABI JAPAN OIL CO. (ADOC) MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT 2015
235 SHARJAH NATIONAL LUBE OIL (SHARLU) SHARJAH NATIONAL LUBE OIL PROJECT 2015
236 PORT OF FUJAIRAH POF – MM2 CONNECTIVITY FOR OT2 PIPELINES 2015
237 FUJAIRAH OIL TERMINAL – FOT FUJAIRAH OIL TERMINAL PROJECT 2015
238 PORT OF FUJAIRAH PORT OF FUJAIRAH PROJECT 2015
239 ABU DHABI JAPAN OIL CO. (ADOC) MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT 2014
240 ADMA OPCO SARB 3 OFFSHORE FULL FIELD DEVELOPMENT PROJECT 2014
241 ZADCO OFFSHORE WELL HEAD PROJECT – UMM AL DHAK FACILITIES FOR WHP 7 & 15 2014
242 ADCO PRODUCTION MANIFOLD AT RDS1 & RDS5 2014
243 ABU DHABI JAPAN OIL CO. (ADOC) MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT 2014
244 DUBAI NATURAL GAS COMPANY LIMITED – DUGAS DUGAS PROJECT 2014
245 FUJAIRAH OIL TERMINAL – FOT FUJAIRAH OIL TERMINAL PROJECT 2014
246 PORT OF FUJAIRAH OT2 PHASE II TOP SIDE FACILITY PROJECT 2014
247 PORT OF FUJAIRAH PORT OF FUJAIRAH PROJECT 2014
248 PORT OF FUJAIRAH POF OT2 PHASE II PROJECT 2014
249 ZADCO OFFSHORE WHP TWINNING PROJECT AT UMM AL DHAK 2014
250 ATS TERMINAL OIL TERMINAL PROJECT – HAMRIYA 2014
251 ILFS TERMINAL ILFS OIL TERMINAL – FUJAIRAH 2014
252 DUGAS JEBEL ALI PLANT FIRE WATER SYSTEM 2014
253 SHARAFCO PETROLEUM FZ SHARAFCO STORAGE TERMINAL HAMRIYAH FREEZONE PROJECT 2014
254 FUJAIRAH OIL TERMINAL – FOT FUJAIRAH OIL TERMINAL PROJECT 2014
255 ABU DHABI JAPAN OIL CO. (ADOC) MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT 2013
256 ADMA OPCO / TECHNIP FLARES MODIFICATION REVAMP PROJECT 2013
257 LAMPRELL RAK GAS COMPANY 2013
258 FRCL – REFINERY – UAE FRCL PROJECT, FUJAIRAH 2013
259 DUGAS JEBEL ALI PLANT FIRE WATER SYSTEM 2013
260 GULF PETROCHEM GULF PETROCHEM PROJECT, FUJAIRAH 2013
261 DNO DNO PROJECT SHJM 2013
262 VHFL SPM PIPELINE MODIFICATION IN MANIFOLD PROJECT 2013
263 ENOC ENOC FUJAIRAH TRADING TERMINAL PROJECT 2013
264 STEVENS SUPPLY INTL SHIP – LINE BLIDING 2013
265 ABU DHABI JAPAN OIL CO. (ADOC) MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT 2012
266 ADMA OPCO OFFSHORE – REPLACEMENT OF 30″ ZK STRIPPER 2012
267 ADCO THAMAMA ‘G’ & HABSHAN 2 DEVELOPMENT PROJECT 2012
268 BOROUGE BOROUGE PLANT 2012
269 EMIRATES ALUMINIUM (EMAL) EMAL PROJECT, TAWEELAH ABU DHABI 2012
270 ABU DHABI JAPAN OIL CO. (ADOC) MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT 2011
271 EMIRATES ALUMINIUM (EMAL) / SNC LAVLIN EMIRATES ALUMINUM SMELTER COMPLEX PLANT WIDE UNDERGROUND PROJECT, TAWEELAH ABU DHABI 2010
272 ABU DHABI JAPAN OIL CO. (ADOC) MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT 2010
273 ABU DHABI JAPAN OIL CO. (ADOC) MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT 2009
274 EMIRATES ALUMINIUM (EMAL) / SNC LAVLIN EMIRATES ALUMINUM SMELTER COMPLEX PLANT WIDE UNDERGROUND PROJECT, TAWEELAH ABU DHABI 2009