GULFTECH is registered in the Ministry of UAE as a service provider, approved with all our End Users and provide the following services or activities to all our End Users & EPC Contractors in the UAE as well as the complete Middle East (not limited to):
| SL. NO. | CLIENT / CONSULTANT | PROJECT | YEAR |
|---|---|---|---|
| 1 | ADCO | ADCO TIE INS PROJECT PACKAGE B | 2016 |
| 2 | ABU DHABI JAPAN OIL CO. (ADOC) | MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT | 2016 |
| 3 | ADMA OPCO | AGFA PROJECT | 2016 |
| 4 | ADCO | REFURBISHMENT OF TANK FARM IN JEBEL DHANNA TERMINAL PROJECT | 2016 |
| 5 | ADCO | EPC FOR SAHIL FIELD DEVELOPMENT PROJECT PHASE 2 PROJECT | 2016 |
| 6 | ADCO | BUHASA PROJECT | 2016 |
| 7 | ADCO | FLOW LINES AND WELLHEADS BUHASA PROJECT-BU741 | 2016 |
| 8 | ADCO | EPC FOR RUMAITHA NORTH CO2 INJECTION PROJECT | 2016 |
| 9 | ADCO | EPC FOR BAB FAR NORTH CO2 INJECTION PROJECT | 2016 |
| 10 | ADCO | CONSTRUCTION OF MPP, MSMS & MPFMS AT BUHASA RDSS PROJECT | 2016 |
| 11 | ADCO | NEW WAG WELLS & CONVERSION OF EXISTING OF GAS INJECTORS WELLS TO WAG WELLS AT SAHIL | 2016 |
| 12 | STAR ENERGY OIL TANKING | SEOT PHASE 7A POLYOLS STORAGE AND HANDLING PROJECT | 2016 |
| 13 | PORT OF FUJAIRAH | POF FOR THE BERTH 3 EXPANSION WORKS | 2016 |
| 14 | PORT OF FUJAIRAH | BPGIC PHASE 1 PROJECT | 2016 |
| 15 | BROOGE PETROLEUM & GAS INVESTMENT COMPANY FZC (BPGIC) | BPGIC FUJAIRAH TERMINAL-PHASE 1 | 2016 |
| 16 | ECOMAR ENERGY SOLUTIONS | PETROLEUM REGENERATION & PROCESSING FACILITY TANK FARM | 2016 |
| 17 | PORT OF FUJAIRAH | PORT OF FUJAIRAH PROJECT | 2016 |
| 18 | PORT OF FUJAIRAH | POF – VLCC JETTY NO.1 PROJECT | 2016 |
| 19 | ALBANNA ENGINEERING | GPC- HAMRIYAH TANK FARM EXPANSION PROJECT | 2016 |
| 20 | ABU DHABI JAPAN OIL CO. (ADOC) | MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT | 2015 |
| 21 | SHARJAH NATIONAL LUBE OIL (SHARLU) | SHARJAH NATIONAL LUBE OIL PROJECT | 2015 |
| 22 | PORT OF FUJAIRAH | POF – MM2 CONNECTIVITY FOR OT2 PIPELINES | 2015 |
| 23 | FUJAIRAH OIL TERMINAL – FOT | FUJAIRAH OIL TERMINAL PROJECT | 2015 |
| 24 | PORT OF FUJAIRAH | PORT OF FUJAIRAH PROJECT | 2015 |
| 25 | ABU DHABI JAPAN OIL CO. (ADOC) | MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT | 2014 |
| 26 | ADMA OPCO | SARB 3 OFFSHORE FULL FIELD DEVELOPMENT PROJECT | 2014 |
| 27 | ZADCO | OFFSHORE WELL HEAD PROJECT – UMM AL DHAK FACILITIES FOR WHP 7 & 15 | 2014 |
| 28 | ADCO | PRODUCTION MANIFOLD AT RDS1 & RDS5 | 2014 |
| 29 | ABU DHABI JAPAN OIL CO. (ADOC) | MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT | 2014 |
| 30 | DUBAI NATURAL GAS COMPANY LIMITED – DUGAS | DUGAS PROJECT | 2014 |
| 31 | FUJAIRAH OIL TERMINAL – FOT | FUJAIRAH OIL TERMINAL PROJECT | 2014 |
| 32 | PORT OF FUJAIRAH | OT2 PHASE II TOP SIDE FACILITY PROJECT | 2014 |
| 33 | PORT OF FUJAIRAH | PORT OF FUJAIRAH PROJECT | 2014 |
| 34 | PORT OF FUJAIRAH | POF OT2 PHASE II PROJECT | 2014 |
| 35 | ZADCO | OFFSHORE WHP TWINNING PROJECT AT UMM AL DHAK | 2014 |
| 36 | ATS TERMINAL | OIL TERMINAL PROJECT – HAMRIYA | 2014 |
| 37 | ILFS TERMINAL | ILFS OIL TERMINAL – FUJAIRAH | 2014 |
| 38 | DUGAS | JEBEL ALI PLANT FIRE WATER SYSTEM | 2014 |
| 39 | SHARAFCO PETROLEUM FZ | SHARAFCO STORAGE TERMINAL HAMRIYAH FREEZONE PROJECT | 2014 |
| 40 | FUJAIRAH OIL TERMINAL – FOT | FUJAIRAH OIL TERMINAL PROJECT | 2014 |
| 41 | ABU DHABI JAPAN OIL CO. (ADOC) | MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT | 2013 |
| 42 | ADMA OPCO / TECHNIP | FLARES MODIFICATION REVAMP PROJECT | 2013 |
| 43 | LAMPRELL | RAK GAS COMPANY | 2013 |
| 44 | FRCL – REFINERY – UAE | FRCL PROJECT, FUJAIRAH | 2013 |
| 45 | DUGAS | JEBEL ALI PLANT FIRE WATER SYSTEM | 2013 |
| 46 | GULF PETROCHEM | GULF PETROCHEM PROJECT, FUJAIRAH | 2013 |
| 47 | DNO | DNO PROJECT SHJM | 2013 |
| 48 | VHFL | SPM PIPELINE MODIFICATION IN MANIFOLD PROJECT | 2013 |
| 49 | ENOC | ENOC FUJAIRAH TRADING TERMINAL PROJECT | 2013 |
| 50 | STEVENS SUPPLY INTL | SHIP – LINE BLIDING | 2013 |
| 51 | ABU DHABI JAPAN OIL CO. (ADOC) | MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT | 2012 |
| 52 | ADMA OPCO | OFFSHORE – REPLACEMENT OF 30″ ZK STRIPPER | 2012 |
| 53 | ADCO | THAMAMA ‘G’ & HABSHAN 2 DEVELOPMENT PROJECT | 2012 |
| 54 | BOROUGE | BOROUGE PLANT | 2012 |
| 55 | EMIRATES ALUMINIUM (EMAL) | EMAL PROJECT, TAWEELAH ABU DHABI | 2012 |
| 56 | ABU DHABI JAPAN OIL CO. (ADOC) | MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT | 2011 |
| 57 | EMIRATES ALUMINIUM (EMAL) / SNC LAVLIN | EMIRATES ALUMINUM SMELTER COMPLEX PLANT WIDE UNDERGROUND PROJECT, TAWEELAH ABU DHABI | 2010 |
| 58 | ABU DHABI JAPAN OIL CO. (ADOC) | MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT | 2010 |
| 59 | ABU DHABI JAPAN OIL CO. (ADOC) | MUBARAZ ISLAND OFFSHORE MAINTENANCE PROJECT | 2009 |
| 60 | EMIRATES ALUMINIUM (EMAL) / SNC LAVLIN | EMIRATES ALUMINUM SMELTER COMPLEX PLANT WIDE UNDERGROUND PROJECT, TAWEELAH ABU DHABI | 2009 |